Posted on 01 Oct 2025 03:34 AM
(RM 523.81 per sq. ft.)
Terrace factory • Built-up : 3,150 sq. ft.
Posted on 24 Sep 2025 08:08 AM
Posted on 22 Aug 2025 01:58 PM
(RM 537.7 per sq. ft.)
Terrace factory | Intermediate • Built-up : 3,050 sq. ft. • Unfurnished
Posted on 05 Aug 2025 05:24 AM
(RM 625 per sq. ft.)
Terrace factory • Built-up : 2,400 sq. ft.