Posted on 20 Sep 2025 03:51 AM
(RM 219.16 per sq. ft.)
Semi-D factory • Built-up : 6,388 sq. ft.
Posted on 18 Sep 2025 08:36 AM
(RM 231.86 per sq. ft.)
Semi-D factory • Built-up : 8,626 sq. ft.
Posted on 10 Ogos 2025 12:58 PM
(RM 236.89 per sq. ft.)
Semi-D factory • Built-up : 9,287 sq. ft.