Posted on 06 Sep 2025 04:45 AM
(RM 684.09 per sq. ft.)
Semi-D factory | Corner lot • Built-up : 8,800 sq. ft.
Posted on 02 Sep 2025 02:06 AM
(RM 375 per sq. ft.)
Semi-D factory • Built-up : 20,000 sq. ft.