Posted on 01 Sep 2025 02:03 PM
(RM 741.8 per sq. ft.)
Semi-D factory • Built-up : 7,010 sq. ft.
Posted on 01 Sep 2025 02:01 PM
(RM 785.38 per sq. ft.)
Semi-D factory • Built-up : 7,003 sq. ft.
Posted on 25 Aug 2025 03:22 PM
Posted on 25 Aug 2025 03:21 PM
(RM 779.19 per sq. ft.)
Semi-D factory • Built-up : 11,005 sq. ft.
Posted on 18 Aug 2025 01:16 PM