Posted on 21 Sep 2025 09:35 AM
(RM 297.21 per sq. ft.)
Semi-D factory • Built-up : 3,810 sq. ft.
(RM 333.24 per sq. ft.)
Semi-D factory • Built-up : 6,857 sq. ft.
Posted on 21 Sep 2025 09:34 AM
(RM 348.59 per sq. ft.)
(RM 327.76 per sq. ft.)
Semi-D factory • Built-up : 2,842 sq. ft.