Posted today 03:41 AM
(RM 260.21 per sq. ft.)
Terrace factory • Built-up : 3,800 sq. ft.
Posted on 22 Sep 2025 12:47 PM
(RM 64.57 per sq. ft.)
Terrace factory | Intermediate • Built-up : 44,910 sq. ft.
Posted on 20 Aug 2025 09:40 AM
(RM 187.5 per sq. ft.)
Terrace factory | End lot • Built-up : 4,000 sq. ft.
Posted on 12 Aug 2025 01:37 AM
(RM 145.44 per sq. ft.)
Terrace factory • Built-up : 9,750 sq. ft.