Posted on 24 Sep 2025 05:19 AM
(RM 715.79 per sq. ft.)
Semi-D factory • Built-up : 9,500 sq. ft.
Posted on 25 Ogos 2025 05:51 AM
(RM 476.83 per sq. ft.)
Semi-D factory • Built-up : 9,752 sq. ft.