Posted on 23 Ogos 2025 12:36 AM
(RM 3.92 per sq. ft.)
Terrace factory • Built-up : 7,656 sq. ft. • Partially Furnished
Posted on 21 Ogos 2025 01:17 PM
(RM 1.5 per sq. ft.)
Terrace factory • Built-up : 6,000 sq. ft.
Posted on 01 Ogos 2025 04:25 PM
(RM 3.75 per sq. ft.)
Terrace factory | Intermediate • Built-up : 1,200 sq. ft.