Posted on 17 Sep 2025 03:04 PM
(RM 2.55 per sq. ft.)
Semi-D factory • Built-up : 3,929 sq. ft.
Posted on 03 Sep 2025 03:03 PM
(RM 3.18 per sq. ft.)