Posted on 05 Sep 2025 05:12 AM
(RM 2.12 per sq. ft.)
Semi-D factory • Built-up : 17,000 sq. ft.
Posted on 04 Sep 2025 08:24 AM
(RM 2.84 per sq. ft.)
Semi-D factory • Built-up : 14,084 sq. ft.