Posted on 30 Sep 2025 02:33 PM
(RM 2.1 per sq. ft.)
Semi-D factory • Built-up : 10,500 sq. ft.
Posted on 23 Sep 2025 02:32 PM
(RM 3.05 per sq. ft.)
Posted on 26 Ogos 2025 04:04 PM
(RM 2.29 per sq. ft.)
Semi-D factory • Built-up : 3,500 sq. ft.
Posted on 26 Ogos 2025 03:31 PM
(RM 2.4 per sq. ft.)
Semi-D factory • Built-up : 7,500 sq. ft.