Posted on 29 Aug 2025 09:47 AM
(RM 4.47 per sq. ft.)
Semi-D factory • Built-up : 8,500 sq. ft.
Posted on 20 Jun 2025 07:53 AM
(RM 3.53 per sq. ft.)