Posted on 26 Sep 2025 03:21 PM
(RM 1.98 per sq. ft.)
Terrace factory • Built-up : 8,100 sq. ft.
Posted on 28 Sep 2025 01:05 PM
(RM 1.23 per sq. ft.)
Semi-D factory • Built-up : 20,289 sq. ft.
Posted on 25 Sep 2025 08:02 AM
(RM 1.5 per sq. ft.)
Terrace factory | Intermediate • Built-up : 4,000 sq. ft. • Unfurnished
Posted on 12 Sep 2025 03:22 PM
(RM 2.81 per sq. ft.)
Detached factory • Built-up : 16,000 sq. ft.