Posted on 22 Sep 2025 09:24 AM
(RM 1.5 per sq. ft.)
Factory • Built-up : 120,000 sq. ft.
Posted on 20 Sep 2025 02:43 AM
(RM 1.76 per sq. ft.)
Factory • Built-up : 21,000 sq. ft.
Posted on 20 Sep 2025 05:16 AM
(RM 1.4 per sq. ft.)
Factory | Intermediate • Built-up : 5,000 sq. ft. • Bare
Posted on 02 Sep 2025 07:16 AM
(RM 1.34 per sq. ft.)
Factory • Built-up : 7,450 sq. ft.