Posted on 24 Jun 2025 04:56 AM
(RM 2.3 per sq. ft.)
Semi-D factory • Built-up : 33,000 sq. ft.
(RM 2.89 per sq. ft.)
Semi-D factory • Built-up : 9,000 sq. ft.