Posted on 21 Sep 2025 03:23 PM
(RM 2.24 per sq. ft.)
Semi-D factory • Built-up : 7,585 sq. ft.
Posted on 23 Sep 2025 06:15 AM
(RM 2.24 per sq. ft.)
Semi-D factory • Built-up : 7,585 sq. ft.
Posted on 03 Sep 2025 07:07 AM
(RM 2.35 per sq. ft.)
Semi-D factory • Built-up : 10,658 sq. ft.