Posted on 17 Sep 2025 03:35 PM
(RM 2.91 per sq. ft.)
Semi-D factory • Built-up : 7,049 sq. ft.
(RM 3.19 per sq. ft.)
Semi-D factory • Built-up : 11,277 sq. ft.
Posted on 02 Sep 2025 10:38 AM
(RM 2.07 per sq. ft.)
Semi-D factory • Built-up : 12,100 sq. ft.