Posted on 21 Apr 2022 01:51 AM
(RM 664 per sq. ft.)
Link factory | End lot • Built-up : 7,500 sq. ft.
Posted on 17 Apr 2022 05:38 AM
(RM 210.24 per sq. ft.)
Link factory • Built-up : 10,940 sq. ft.
Posted on 03 Apr 2022 01:43 PM
(RM 728.93 per sq. ft.)
Link factory • Built-up : 2,195 sq. ft.